Projects

Creating Buildings With Intellect

Three Prime Projects

A

Renata Pharmaceuticals Ltd.

Supply, Install, Commission & Validation of HVAC Automation and Control

Period: 2018 – 2025

Budget: USD 4,000,000

Contact: Golam Arif (Project Manager)

Tel: +8801723342876 | Email: g.arif@renata-ltd.com

B

Beximco Pharmaceuticals Limited

Supply, Install, Commission & Validation of HVAC Automation and Control

Period: January 2015 – October 2015

Budget: USD 500,000

Contact: Mahabub Hasan (Project Manager)

Tel: +880 1811416898 | Email: hasan2009@beximcophltd.com

C

IDLC Finance Ltd.

Supply, Install, Commission & Validation of BMS System, Data Structured Cabling System, IP Phone System, IP TV System, Access Control System, CCTV Surveillance System, Car Parking Management System, and PA System

Period: 2026 – Running

Budget: BDT 153,510,824

Contact: M. Maksudul Hoque (Project Coordinator)

Tel: 88 01713 069797 | Email: Maksud@IDLC.com

Fire Detection, Fire Protection & PA Projects

Akij Flour Mills Ltd.

Address
304, Willson Road, Kadom Rasol, Bandar, Narayanganj-1410
Completed
June 2026
Period
March 2022 – 2026
Value
USD 412,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully executed the complete design, engineering, supply, installation, testing, commissioning, and handover of the Fire Detection, Fire Protection, and Public Address (PA) System for Akij Flour Mills Ltd., with a total project value of USD 412,000.

The scope included the implementation of an integrated fire alarm and detection system, automatic and manual fire protection solutions, as well as a reliable Public Address and Voice Evacuation System to facilitate effective emergency communication throughout the facility. ACE Controls Ltd. played a key role as the system integration and execution partner by providing:
• Complete engineering design and system planning.
• Supply of high-quality fire detection, fire protection, and PA system equipment.
• Installation and integration of all systems across the facility.
• Testing, commissioning, and performance verification of the complete solution.
• Coordination with project stakeholders to ensure smooth execution within the project schedule.
• Operator training, technical documentation, and post-commissioning support.
• Delivery of a reliable, scalable, and standards-compliant life safety solution tailored to the operational requirements of Akij Flour Mills Ltd.

Through its technical expertise, experienced engineering team, and commitment to quality, ACE Controls Ltd. successfully delivered a comprehensive safety and emergency communication system that significantly improved the protection of personnel, assets, and operational continuity at Akij Flour Mills Ltd. The successful completion of this project further demonstrates ACE Controls Ltd.'s capability in delivering large-scale industrial fire safety and integrated life safety systems for manufacturing and process industries.

Akij Bakers Ltd.

Address
Shilmun, Tongi, Gazipur
Completed
June 2026
Period
June 2022 – 2026
Value
USD 522,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully executed the design, engineering, supply, installation, testing, and commissioning of a comprehensive Fire Detection, Fire Protection, and Public Address (PA) System for Akij Bakers Ltd., with a total project value of USD 522,000.

The project was designed to enhance the facility's fire and life safety infrastructure by implementing an integrated system for early fire detection, effective fire protection, and efficient emergency communication. ACE Controls Ltd. delivered a reliable and standards-compliant solution that supports the safety of personnel, protects valuable assets, and ensures uninterrupted operations. The successful completion of this project reflects the company's proven expertise in delivering high-quality life safety and fire protection systems for large-scale industrial and manufacturing facilities.

Akij Printing & Packaging Ltd.

Address
Shilmun, Tongi, Gazipur
Completed
June 2026
Period
June 2022 – 2026
Value
USD 280,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully delivered a tailored Fire Detection, Fire Protection, and Public Address (PA) System for Akij Printing & Packaging Ltd., with a total project value of USD 280,000.

With a focus on operational safety and efficiency, ACE Controls Ltd. provided a well-coordinated and integrated system that supports quick emergency response while maintaining smooth industrial operations. The project reflects the company's commitment to delivering reliable, industry-specific fire and life safety solutions. This successful installation further reinforces ACE Controls Ltd.'s expertise in executing advanced fire protection projects for large-scale manufacturing environments, with a strong emphasis on safety, reliability, and performance.

Northern Fashion Ltd.

Address
Zirani, Kashimpur, Gazipur
Completed
November 2025
Period
March 2022 – 2025
Value
USD 262,584

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully completed the design, engineering, supply, installation, testing, and commissioning of an integrated Fire Detection, Fire Protection, and Public Address (PA) System for Northern Fashion Ltd., with a total project value of USD 262,584.

As a garment manufacturing facility operating with large production floors, fabric storage areas, and high-density workforce, Northern Fashion Ltd. required a dependable life safety system to ensure rapid emergency response and uninterrupted business operations. ACE Controls Ltd. delivered a customized solution that integrates advanced fire detection, effective fire protection, and clear voice communication, providing comprehensive coverage across production, warehouse, utility, and administrative areas.

This project further demonstrates ACE Controls Ltd.'s expertise in delivering high-performance fire and life safety solutions for Bangladesh's ready-made garment (RMG) industry, where operational continuity and employee safety are of paramount importance.

Northern Clothing Ltd.

Address
EPZ-Kaliakoir Road, Chandra, Gazipur
Completed
November 2025
Period
March 2022 – 2025
Value
USD 162,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully delivered a turnkey Fire Detection System and Fire Protection System for Northern Clothing Ltd., with a project value of USD 162,000, reinforcing the client's commitment to workplace safety and operational excellence.

By successfully completing this project, ACE Controls Ltd. demonstrated its ability to deliver high-quality life safety solutions that align with the evolving needs of Bangladesh's ready-made garment sector. The project reflects the company's commitment to engineering excellence, quality workmanship, and customer satisfaction, further strengthening its reputation as a trusted provider of integrated fire and safety systems for industrial facilities.

Popular Pharmaceuticals PLC.

Address
Tongi Industrial Area, Tongi, Gazipur
Completed
Running
Period
March 2023 – Running
Value
USD 885,000 + BDT 14,320,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. has been entrusted with the design, engineering, supply, installation, testing, commissioning, and maintenance of advanced Fire Detection Systems (FDS) for Popular Pharmaceuticals Ltd. and multiple branches of Popular Diagnostic Centre, including Bogura, Rajshahi, Chattogram, Shyamoli, and Uttara.

This prestigious portfolio demonstrates ACE Controls Ltd.'s capability to deliver intelligent and reliable fire detection solutions. With a Foreign Supply value of USD 885,000 and a Local Supply & Services value of BDT 14,320,000, this project represents one of ACE Controls Ltd.'s major achievements in the healthcare and pharmaceutical sector. The successful execution of these projects demonstrates the company's capability to deliver large-scale, standards-compliant fire detection solutions while maintaining the highest levels of quality, reliability, and customer satisfaction.

Incepta Pharmaceuticals Ltd.

Address
Kandapara, Dhamrai Plant, Dhaka
Completed
Running
Period
June 2025 – Running
Value
USD 1,150,244 + BDT 67,400,132

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully delivered a fully integrated Fire Detection System (FDS), Fire Protection System (FPS), Gas Detection System (GAS), and Public Address (PA) System for Incepta Pharmaceuticals Ltd., one of the country's leading pharmaceutical manufacturers.

The project was designed to provide a comprehensive life safety and emergency response solution across critical production areas, laboratories, warehouses, utilities, and administrative facilities. The integrated system ensures early fire and gas hazard detection, rapid alarm notification, effective emergency communication, and reliable fire protection response to safeguard personnel, assets, and continuous pharmaceutical operations.

With a Foreign Supply value of USD 1,150,244.00 and a Local Supply & Services value of BDT 67,400,132.00, this project represents a significant milestone in ACE Controls Ltd.'s portfolio. It demonstrates the company's capability to execute complex, multi-discipline life safety systems that meet stringent industrial and regulatory requirements.

Healthcare Formulation Ltd.

Address
Sreepur, Gazipur
Completed
2026
Period
June 2024 – 2026
Value
USD 240,000 + BDT 2,958,215

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully engineered and deployed a state-of-the-art, facility-wide Fire Detection System for Healthcare Formulation Ltd. This high-stakes infrastructure project underlines our technical capability to deliver world-class safety automation solutions within the highly regulated and sensitive environment of pharmaceutical manufacturing.

Valued at USD 240,000 with an additional local component of BDT 2,958,215, this project highlights our capacity to deliver highly technical, life-saving automation solutions within the strict compliance boundaries of the pharmaceutical manufacturing industry.

GPH Ispat Limited

Address
Crown Chamber, 325 Asadgonj, Chattogram-4000
Completed
December 2023
Period
January 2019 – December 2023
Value
USD 739,600 + BDT 1,634,350

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully delivered a comprehensive, high-capacity industrial safety and system integration solution for GPH Ispat Limited, one of the region's largest and most technologically advanced steel manufacturers. Operating within the extreme environmental conditions of a heavy industrial plant, ACE Controls Ltd. engineered a robust, resilient system architecture designed to withstand high temperatures, dust, and electrical interference.

With a total financial footprint of USD 739,600 for specialized international hardware procurement and BDT 1,634,350 for local engineering and execution services, this project underscores our capacity to manage large-scale, high-value industrial infrastructure investments flawlessly.

Knit Plus Ltd.

Address
Joharchanda, Belma, Savar
Completed
2024
Period
May 2022 – 2024
Value
USD 294,226 + BDT 3,700,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. has successfully engineered, procured, and commissioned a comprehensive, unified life-safety and communication ecosystem for Knit Plus Ltd., a premier leader in the export-oriented ready-made garments (RMG) and textile sector.

This turnkey, multi-disciplinary infrastructure development represents a total capital investment of USD 294,226 for specialized international equipment procurement, paired with BDT 3,700,000 for high-precision local engineering, systems integration, and regulatory commissioning.

Nassa Super Wash Ltd.

Address
Nischintopur, Zirabo, Ashulia, Savar
Completed
December 2021
Period
November 2018 – December 2021
Value
USD 225,502 + BDT 2,750,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
Ace Controls Ltd. successfully completed the design support, supply, installation, testing, commissioning, and handover of the Fire Detection System (FDS), Fire Protection System (FPS), and Public Address (PA) System for Nassa Super Wash Ltd. The project was undertaken to enhance the facility's fire and life safety infrastructure, ensuring compliance with applicable codes and industry standards while providing reliable protection for personnel, equipment, and operational assets.

With a total financial footprint of USD 225,502.00 for specialized international hardware procurement and BDT 2,750,000 for local engineering and execution services, this project underscores our capacity to manage large-scale, high-value industrial infrastructure investments flawlessly.

Nassa Tower

Address
238 Bir Uttam Mir Shawkat Sarak, Tejgaon Industrial Area, Dhaka-1208
Completed
2024
Period
May 2022 – 2024
Value
USD 96,228 + BDT 4,354,662

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
Ace Controls Ltd. successfully executed the Fire Detection System (FDS), Fire Protection System (FPS), CCTV Surveillance System, Car Parking Management System, and Door & Access Control System for Nassa Tower, delivering a comprehensive integrated building safety and security solution.

This turnkey, multi-disciplinary infrastructure development represents a total capital investment of USD 96,228.00 for specialized international equipment procurement, paired with BDT 4,354,662.00 for high-precision local engineering, systems integration, and regulatory commissioning.

Nassa Super Garments Ltd.

Address
Nischintopur, Zirabo, Ashulia, Savar
Completed
December 2021
Period
July 2018 – December 2021
Value
USD 478,927 + BDT 4,453,800

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
Ace Controls Ltd. successfully executed the Fire Detection System (FDS), Fire Protection System (FPS), and Public Address (PA) System for Nassa Super Garments Ltd., delivering a fully integrated fire and life safety solution designed to safeguard personnel, production facilities, and valuable assets.

With a total financial footprint of USD 478,927.00 for specialized international hardware procurement and BDT 4,453,800.00 for local engineering and execution services, this project underscores our capacity to manage large-scale, high-value industrial infrastructure investments flawlessly.

Nassa Supreme Wash Ltd.

Address
Plot No. 15-16, Cumilla EPZ, Cumilla 3500
Completed
2024
Period
May 2022 – 2024
Value
USD 128,515 + BDT 2,542,158

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. played a key role in the Nassa Supreme Wash Ltd. project by delivering its assigned engineering solutions with a strong focus on quality, efficiency, and timely execution. The project reflects the company's technical capability and commitment to meeting client expectations while maintaining high industry standards.

The project generated a total business value of USD 128,515 and BDT 2,542,158, adding another successful milestone to ACE Controls Ltd.'s growing portfolio of industrial projects.

Nassa Spinners & Garments Ltd.

Address
Plot No. 15-16, Cumilla EPZ, Cumilla 3500
Completed
December 2020
Period
March 2018 – December 2020
Value
USD 238,250 + BDT 2,890,182

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
Ace Controls Ltd. successfully executed the Fire Detection System (FDS), Fire Protection System (FPS), and Public Address (PA) System for Nassa Spinners & Garments Ltd., delivering a fully integrated fire and life safety solution designed to safeguard personnel, production facilities, and valuable assets.

With a total financial footprint of USD 238,250.00 for specialized international hardware procurement and BDT 2,890,182.00 for local engineering and execution services, this project underscores our capacity to manage large-scale, high-value industrial infrastructure investments flawlessly.

Nassa Diamond

Address
SE-D (3), 28 Gulshan Avenue, Dhaka
Completed
2020
Period
July 2018 – 2020
Value
USD 221,171 + BDT 3,201,977

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully executed the Fire Detection System (FDS), Fire Protection System (FPS), and Public Address (PA) System for the Nassa Diamond project. The company was responsible for delivering reliable and integrated life safety systems that enhance fire protection, enable early detection, and ensure effective emergency communication throughout the facility. Consultant: Techno Engineers & Consultants.

The project was completed with a contract value of USD 221,171.00 and BDT 3,201,977.00, further reinforcing the company's strong portfolio of successful project deliveries.

Shanta Glass House

Address
Plot 2, Block SE (B), Gulshan Avenue, Dhaka-1212
Completed
July 2018
Period
March 2015 – July 2018
Value
USD 70,000 + BDT 7,462,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully secured and executed the Fire Protection System (FPS), Fire Detection System (FDS), and Public Address (PA) System package for the Shanta Glass House project. The company was responsible for the design, supply, installation, testing, and commissioning of these essential life safety systems, ensuring compliance with applicable safety standards and supporting the project's operational reliability.

Through the successful completion of this scope, ACE Controls Ltd. achieved a project value of USD 70,000 & Local Supply & Installation BDT 7,462,000. This accomplishment reflects the company's capability to deliver high-quality, integrated fire and life safety solutions for prestigious commercial developments.

Citizen Tower

Address
227/B, Tejgaon-Gulshan Link Road, Dhaka
Completed
2025
Period
December 2023 – 2025
Value
USD 82,000 + BDT 2,406,141

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
The Citizen Tower project highlights ACE Controls Ltd.'s expertise in delivering advanced Fire Detection System (FDS) solutions for high-rise commercial buildings. From system design and engineering to installation, testing, and commissioning, ACE Controls Ltd. ensured the implementation of a dependable fire detection network that supports rapid incident identification and enhances overall building safety.

With a project value of USD 82,000 and BDT 2,406,141.00, this achievement reflects the company's commitment to delivering reliable, standards-compliant fire safety systems and its continued success in executing projects for prestigious commercial developments.

ABA Fashion Limited

Address
Sena Kalyan Commercial Complex, Tongi, Dhaka
Completed
2017
Period
February 2015 – 2017
Value
USD 523,344 + BDT 4,517,100

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully delivered the Fire Detection System (FDS) and Fire Protection System (FPS) for ABA Fashion Limited, a leading organization in the garments industry. The project involved the design, supply, installation, testing, and commissioning of integrated fire safety systems to enhance the protection of personnel, production facilities, and valuable assets while ensuring compliance with industry safety standards.

With a contract value of USD 523,344.00 and BDT 4,517,100.00, this project stands as a significant achievement for ACE Controls Ltd., reinforcing its expertise in providing reliable fire and life safety solutions for the ready-made garments (RMG) sector.

IDLC Finance PLC.

Address
153, Tejgaon Industrial Area, Dhaka
Completed
Running
Period
June 2026 – Running
Value
BDT 153,510,824

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully executed a comprehensive Building Management System (BMS) and Extra-Low Voltage (ELV) solution for IDLC Finance PLC., delivering a fully integrated smart building infrastructure.

The project scope included the implementation of the Building Management System (BMS), Data Structured Cabling System, IP Phone System, IP TV System, Access Control System, CCTV Surveillance System, Car Parking Management System, and Public Address (PA) System, ensuring efficient building operations, enhanced security, and seamless communication. The project was completed with a contract value of BDT 153,510,824, further strengthening the company's portfolio of high-value smart building and integrated ELV projects.

Renata Pharmaceuticals Ltd. (KGF)

Address
Valuka, Mymensingh
Completed
2023
Period
February 2021 – 2023
Value
USD 1,275,000 + BDT 93,000,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. is proud to have been entrusted by Renata Pharmaceuticals Ltd. (KGF) for the implementation of three Building Management System (BMS) projects during 2021 and 2022.

With a combined project value of USD 1,275,000.00 & BDT 93,000,000.00, these projects reflect Renata's confidence in ACE Controls Ltd.'s technical expertise, engineering excellence, and commitment to delivering reliable automation solutions for critical pharmaceutical facilities. Each project was designed to provide intelligent monitoring, seamless integration, energy-efficient operation, and regulatory-compliant environmental control supporting the high standards required in pharmaceutical manufacturing.

Renata Pharmaceuticals Ltd. (RPPF)

Address
Noyapara, Mirzapur, Rajendrapur, Gazipur
Completed
2025
Period
2018, 2021, 2024
Value
USD 650,000 + BDT 35,000,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully executed the Building Management System (BMS) for the Rajendrapur Potent Product Facility (RPPF) of Renata PLC. The project was implemented in multiple phases during 2018, 2021, and 2024, with a contract value of USD 650,000.00 and a local project value of BDT 35,000,000.00.

The successful completion of this prestigious project demonstrates our expertise in delivering advanced building automation solutions for highly regulated pharmaceutical manufacturing facilities. Our BMS solution provides centralized monitoring and control of critical building services, ensuring operational efficiency, environmental stability, energy optimization, and compliance with stringent pharmaceutical standards.

Renata Oncology

Address
Rajendrapur, Gazipur
Completed
2024
Period
2021, 2023 – 2024
Value
USD 657,676 + BDT 80,850,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
Building on the confidence established through previous projects, ACE Controls Ltd. was awarded additional BMS projects for the Renata Oncology facility during 2021 and 2023.

With a total project value of USD 657,676.00 and BDT 80,850,000.00, these projects are a testament to our consistent performance, technical expertise, and commitment to delivering high-quality automation solutions. The continued partnership with Renata Oncology is a proud milestone that inspires us to deliver world-class Building Management System solutions for the pharmaceutical industry.

Renata SPPF

Address
Hobirbari, Valuka, Mymensingh
Completed
2022
Period
2021
Value
USD 630,000 + BDT 3,000,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully implemented the Building Management System (BMS) for Renata PLC's Solid Product Production Facility (SPPF). The project value was USD 630,000.00 with a local project value of BDT 3,000,000.00.

The system ensures efficient monitoring and control of critical building services, supporting reliable operation, energy efficiency, and compliance with pharmaceutical standards. The successful execution further strengthens our long-term relationship with Renata PLC and highlights our capability in delivering advanced BMS solutions for the pharmaceutical sector.

Renata MDI-DPI

Address
Bhaluka, Mymensingh
Completed
December 2014
Period
January 2013 – December 2014
Value
USD 159,170 + BDT 22,000,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully delivered the Building Management System (BMS) for the MDI-DPI Facility of Renata PLC. The project, valued at USD 159,170.00 with a local project value of BDT 22,000,000.00, was executed to ensure precise monitoring and control of critical building services within a highly regulated pharmaceutical environment.

The implemented BMS solution enhances operational reliability, energy efficiency, and environmental stability, ensuring compliance with pharmaceutical manufacturing standards.

Renata PLC – Pellet Facility

Address
Rajendrapur, Gazipur
Completed
2023
Period
August 2021 – 2023
Value
USD 261,214 + BDT 25,160,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully executed the Building Management System (BMS) for the Pellet Facility of Renata PLC. The project, valued at USD 261,214.00 with a local project value of BDT 25,160,000.00, was implemented to deliver a fully integrated and reliable building automation platform for a critical pharmaceutical production environment.

This successful project further strengthens ACE Controls Ltd.'s strategic partnership with Renata PLC and highlights our capability in delivering high-end Building Management System solutions for complex and regulated industrial environments.

Ninakabbo

Address
Gulshan-Tejgaon Link Road, Dhaka-1212
Completed
December 2014
Period
January 2013 – December 2014
Value
USD 300,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
Ninakabbo is a prestigious 14-storey high-rise commercial development by Epyllion Group, located in the prime business district of Gulshan-1, Dhaka.

ACE Controls Limited was engaged as the specialist building automation contractor for Ninakabbo, delivering a comprehensive HVAC Automation & Control system using Siemens Building Management System (BMS) technology ensuring optimal climate performance, energy efficiency, and centralized monitoring across all floors of the tower. In addition, ACE Controls designed and commissioned a full Siemens Fire Detection & Alarm System, providing robust life-safety coverage, early warning capabilities, and compliance with international fire safety standards throughout the entire building.

Le Méridien Hotel

Address
79/A Commercial Area, Airport Road, Nikunja 2, Khilkhet, Dhaka-1229
Completed
2023
Period
January 2014 – 2016
Value
USD 1,000,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls successfully executed the HVAC Automation System for Le Méridien Hotel, with a contract value of USD 1,000,000.00.

The scope of work included the design support, supply, installation, programming, integration, testing, and commissioning of the HVAC Automation System, enabling centralized monitoring and control of heating, ventilation, and air conditioning equipment throughout the hotel. The implemented automation solution optimized HVAC performance, improved energy efficiency, enhanced occupant comfort, and provided reliable operation through advanced monitoring, scheduling, alarm management, and system integration.

Popular Pharmaceuticals Ltd. (BMS)

Address
Tongi Industrial Area, Tongi, Gazipur
Completed
2026
Period
July 2023 – 2026
Value
USD 340,000 (overall) · BDT 3,000,000 executed

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls successfully executed a significant portion of the Building Management System (BMS) for Popular Pharmaceuticals Ltd., located at Tongi Industrial Area, Gazipur, Bangladesh. The overall BMS project had a contract value of USD 340,000.00, while ACE Controls completed works valued at BDT 3,000,000.00.

ACE Controls' scope included the supply, installation, integration, testing, and commissioning of BMS components to support centralized monitoring and control of critical building services. The implemented solution contributed to improved operational efficiency, enhanced energy management, reliable system performance, and effective building automation, helping ensure a safe and well-controlled pharmaceutical manufacturing environment.

Orion Pharmaceuticals Ltd.

Address
D/28/2, Sumilpara, Siddhirganj, Narayanganj-1431
Completed
2023
Period
January 2014 – 2016
Value
USD 600,000 (overall) · BDT 3,000,000 executed

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls successfully executed the Building Management System (BMS), Energy Management System (EMS), and Fire Detection System (FDS) for Orion Pharmaceuticals Ltd. The overall project had a contract value of USD 600,000.00, while ACE Controls completed works valued at BDT 3,000,000.00.

The scope of work included the supply, installation, integration, testing, and commissioning of the BMS, EMS, and FDS, providing centralized monitoring and control of building services, energy consumption, and fire detection systems. The integrated solution enhanced operational efficiency, optimized energy utilization, improved facility safety, and enabled reliable monitoring of critical infrastructure.

IPCO Development (Bangladesh) Ltd. – United Group

Address
Civil Aviation Plot, Dhaka-Tongi Highway, Kurmitola, Dhaka-1229
Completed
2025
Period
September 2024 – 2025
Value
USD 102,579 + BDT 25,774,673

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. successfully executed the Building Management System (BMS) for IPCO Development (Bangladesh) Ltd., a concern of United Group, delivering an intelligent and fully integrated building automation solution for efficient facility management. The project encompassed detailed engineering, supply, installation, programming, testing, commissioning, and seamless integration of the BMS with the building's critical Mechanical, Electrical, and Plumbing (MEP) systems.

Building on the reliability and proven performance of its BMS solutions, ACE Controls Ltd. has also been entrusted to provide automation solutions for United Hospital, United Medical College, Crowne Plaza Dhaka, and other associated facilities under United Group, reinforcing the client's confidence in the company's technical expertise, quality of service, and long-term commitment to excellence.

Standard Chartered Bank

Address
HQ, 67 Gulshan Avenue, Dhaka
Completed
2023
Period
January 2014 – 2016
Value
BDT 12,250,000

DESCRIPTION / ACE CONTROLS' CONTRIBUTION:
ACE Controls Ltd. was entrusted with the execution of the Building Management System (BMS) for Standard Chartered Bangladesh, one of the world's leading international banking institutions. The project involved the complete engineering, supply, installation, programming, integration, testing, commissioning, and successful handover of a state-of-the-art Building Management System designed to enhance the operational efficiency and sustainability of the facility.

The successful completion of this prestigious project demonstrates ACE Controls Ltd.'s technical excellence, project management capability, and commitment to delivering intelligent building automation solutions for mission-critical and high-profile commercial facilities.

ACE CONTROLS LIMITED | Gulshan-1, Dhaka-1212 | www.acecontrolsltd.com | Authorized Siemens Solution Partner
logo current
Quick Links
Home
About Us
Services
Contact Us
Our Location
Gulshan 1, House-25, 1st Floor
CSE A Rana Villa, Rd 121
Dhaka 1212
© 2026 Ace Controls Limited. All Rights Reserved.
Scroll to Top